PRNews

State Grid Tacheng Power Supply Company: The first "renovation + capacity expansion" wind power project is connected to the grid

Cision | Fri, Sep 20 2024 10:37 PM AEST

1695367561_650d4189d32c8_1692951951_64e8658fe70f4_breaking_news_600.png
Image Source: Sivastatz

TACHENG, China, Sept. 20, 2024 /PRNewswire/ -- On September 14, the "49,500-kilowatt renovation + 50,000-kilowatt capacity expansion" project of Tacheng Tianrun Mayitas Wind Farm was successfully powered on, marking the official grid connection of the first "renovation + capacity expansion" wind power project in the Tacheng power grid.

It is reported that Guohua Mayitas Wind Farm involved in this renovation project is the first wind farm in Tacheng area. It is located in the Mayitas wind area, one of the nine major wind areas in Xinjiang. It has been connected to the grid and operated for 15 years. This renovation replaces 66 750-kilowatt wind turbines with 6 8340-kilowatt wind turbines, realizing "replacing small ones with large ones". The 50,000-kilowatt wind power capacity expansion is to add 6 8340-kilowatt wind turbines. This time, a capacity of 44,000 kilowatts will be connected to the grid, supported by 5,000 kilowatts/10,000 kilowatt-hours. After the project is put into production, the annual online power generation can reach 325 million kilowatt-hours. Its annual power generation can save about 91,100 tons of standard coal, reduce carbon dioxide emissions by about 250,100 tons, and reduce sulfur dioxide emissions by about 30.5 tons.

In order to ensure the smooth grid connection of this project, State Grid Tacheng Power Supply Company attaches great importance. During the project construction process, special personnel are sent to the site to inspect the project construction progress, and technical personnel are organized many times for professional docking. Actively communicate with the project owner to timely grasp the project progress and provide whole-process tracking services. And for the defects found in the acceptance of this project, a rectification notice is issued to urge the project owner to eliminate the defects in time to ensure that the project is connected to the grid in accordance with laws and regulations.

Subsequently, Tacheng Company will continue to do a good job in the grid connection acceptance of projects such as the 500,000-kilowatt wind power of Sany Heavy Energy Company and the 200,000-kilowatt wind power of Emin County Guoxin Wind Power Generation Co., Ltd. to ensure that new energy projects are put into production as planned. 

Stock Market

RBC says this stock is a 'top mid-cap cybersecurity idea,' starts coverage at Buy

Investing.com -- RBC Capital Markets initiated research coverage of Cyberark Software Ltd (NASDAQ:CYBR), assigning an Outperform rating and ...

Investing | Sat, Sep 21 2024 12:49 AM AEST

Read More
World News

NRG Energy Celebrates 17th Annual Volunteer Week with One Million Meals

HOUSTON, September 20, 2024 /3BL/—NRG Energy, Inc.’s (NYSE:NRG) 17th annual positiveNRG Impact Week united thousands of employees in 30 cities ...

3BL | Sat, Sep 21 2024 12:45 AM AEST

Read More
World News

AB: PRISM - Unlocking the Power of ESG Data

Kathleen Dumes, CFA| Responsible Investing Research Analyst—Fixed Income Responsible InvestingFor a deeper dive into PRISM 3.0, read our paper, Breaking ...

3BL | Sat, Sep 21 2024 12:30 AM AEST

Read More
PRNews

Fosi Audio Launches 7th Anniversary Celebration with the Theme "Your Voice Rocks & Sparks"

NEW YORK, Sept. 20, 2024 /PRNewswire/ -- Fosi Audio, a beloved brand among audiophiles worldwide, has officially launched its grand 7th-anniversary ...

Cision | Sat, Sep 21 2024 12:30 AM AEST

Read More
PRNews

Beijing Welcomes Global Tourists with "Great Wall Heroes Global Marketing Campaign"

"Great Wall Heroes 2024—Ensemble of the Great Wall and the Central Axis" Successfully Held at Badaling Great Wall ...

Cision | Sat, Sep 21 2024 12:17 AM AEST

Read More